NowThrough Aug 10–12
Migration & foundation
Legacy sell-wave absorbed before trading. Strategy and narrative set.
- Migration closed. Holders staked or sold into a capped $200K buyout. No overhang.
- GTM review. Narrative, tokenomics, calendar consolidated into one brief.3SL · GTM
- MM plan for first 48 hours after TGE.3SL · MM
- Launch contracts audited. DEX set audits before September.
Result: Clean float, MM strategy set, narrative locked.
Now~Aug 10–12
Coming-soon & ordinal crossing
Site flips; Motocat crossing opens; MM staged for deploy.
- Coming-soon page live.
- Motocat crossing. 1,000 burn-to-claim slots for ordinal holders.
- MM armed for the seed.3SL · MM
Result: Infra staged; MM ready to hold price from block one.
Next~Aug 12 – Sep 1
The launch farm
21-day vampire farm. Every position buys MOTO. BD fires at peak.
- MOTO deploys + farm opens (~Aug 12). Stable pools seed ~30min later.
- MM execution live. Hold price through the farm; manage thin float.3SL · MM
- Motocat free mint (~Aug 17). Gasless, sign in with X.
- Farm week 2 — 30 pairs (~Aug 19–25). Peak attention.
- BD outreach at peak. Intros across 140+ partners — aggregators, terminals, listings.3SL · BD
- Farm week 3 — community pools (~Aug 26 – Sep 1).
Result: Idle bags become MOTO buy pressure + migrating liquidity. BD pipeline live.
Later~Sep 2–4
DEX live
Farm liquidity migrates. Fee engine, rakeback, staking switch on.
- One-click LP migration. MOTO/WETH becomes the deep pool.
- Fee engine on. 1% fee, rakeback, buyback-burn, staking vaults, Points S1.
- Token Deployer live. TOKEN/ETH + TOKEN/MOTO pools, LPs burned.
- Drive DEX volume. Routing, incentives, volume partners on live pools.3SL · VOL
Result: Live exchange; trader-payout flywheel starts.
Later~Sep 16
Launchpad + Robinhood
Second volume surface and first multi-chain deployment.
- moto.fun ships. Bonding curve on Motoswap's rails; burned dual pools.
- Robinhood Chain deployment. Same day; Uniswap is the day-one AMM.
- Drive launchpad volume. Graduations market-buy MOTO with half the raised ETH.3SL · VOL
Result: Second demand surface; graduations feed MOTO.
HorizonNot dated
CEX & multi-chain
Extend depth to centralized venues; expand the footprint.
- CEX strategy. Listing approach and market-making support across CEX venues.3SL · CEX
- BSC deployment. Notional next target; not committed.
- Sustain mining + Season 1 airdrop. ~11 months; vested airdrop.
Result: CEX depth and multi-chain reach.